William Street tunnel
From Underfoot
The William Street tunnel is a railway tunnel under the central business district of Perth, Western Australia. Built between 2004 and 2007 as part of the construction of the Mandurah line, the tunnel connects the Mandurah line to the Yanchep line, running under William Street for much of its length. It consists of 770 metres (2,530 ft) of twin bored tunnel plus cut-and-cover tunnel at either end, with two stations: Perth Underground and Elizabeth Quay.
Wikimedia, Wikidata
length: 1848 metre,
Transperth Train Operations, Australia,
-
Location: -31.95, , KML, Cluster Map, Maps,
| Type | Subtype | Date | Description | Notes | Source |
|---|---|---|---|---|---|
| commons | image | Perth-Yard-east-061007 | Commons | ||
| commons | image | OIC transperth esplanade station tunnel | Commons | ||
| commons | image | Perth Train Station, Underground Entry | Commons | ||
| commons | image | OIC perth station tunnel inside | Commons | ||
| commons | image | Perth station tunnel closeup | Commons | ||
| commons | image | Perth underground to jul22 gn | Commons | ||
| commons | image | William Street tunnel and Perth City Link tunnel entrances | Commons | ||
| commons | image | William Street tunnel and Perth City Link tunnel entrances 01 (cropped) | Commons | ||
| commons | image | William Street tunnel and Perth City Link tunnel entrances | Commons | ||
| commons | image | William Street tunnel and Perth City Link tunnel entrances 02 (cropped) | Commons | ||









