Regional Connector

From Underfoot

Q7309029




The Regional Connector Transit Project constructed a 1.9-mile (3.1 km) light rail tunnel for the Los Angeles Metro Rail system in Downtown Los Angeles. It connected the A and E lines with the former L Line. The A and E lines previously both terminated at 7th Street/Metro Center station, coming from Long Beach and Santa Monica, respectively, while the L Line ran through Little Tokyo/Arts District to either Azusa or East Los Angeles. Now the A and E lines continue together through new stations at Grand Avenue Arts/Bunker Hill, Historic Broadway, and Little Tokyo/Arts District. From there, they diverge on the former L Line toward Azusa and East Los Angeles, respectively. The project provides a one-seat ride into the core of Downtown for passengers on those lines who previously needed to transfer, thus reducing or altogether eliminating many transfers of passengers traveling across the region via Downtown Los Angeles.

WikimediaWikidata
length: 1.9 mile, 
subway tunnelQ30


Location: 34.057, , KML, Cluster Map, Maps,
Loading map...
    Regional Connector construction on East 1st Street, July 2017Regional Connector construction on East 1st Street, July 2017
    Platform of LA Metro`s Grand Avenue Arts/Bunker Hill station.Platform of LA Metro's Grand Avenue Arts/Bunker Hill station.
    Platform of Los Angeles Metro`s Historic Broadway station.Platform of Los Angeles Metro's Historic Broadway station.