Dazhushan Tunnel

From Underfoot

Revision as of 20:52, 21 November 2024 by John (talk | contribs) (Bot: Automated import of articles)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Q56272490




The Dazhushan Tunnel (大柱山隧道) is a 14.484 km (9.0 mi) railway tunnel in Baoshan, Yunnan, China as part of the Dali–Ruili railway. Construction of the tunnel began in August 2008 and was carried out by the First Engineering Bure Crec (中铁一局). Its construction was expected to take five years, but because of extreme geological conditions along its alignment, completion took place on 28 April 2020, after 12 years of construction. As another tunnel, Gaoligongshan Tunnel, along the railway line was still under construction, it did not enter service until 2022.

Wikidata
railway tunnelPeople's Republic of China
link={{{3}}}
    ​ ​


Location: 25.2628, 99.2522, KML, Cluster Map, Maps,
1 places

Loading map...
  • Dazhushan Tunnel
    railway tunnel in China which connects to the China-Myanmar border
    TypeSubtypeDateDescriptionNotesSource
    sitetunnelDazhushan Tunnelrailway tunnelWikidata