Roseville Tunnel

From Underfoot

Q7368741




Roseville Tunnel is a 1,000-foot (300 m) two-track railroad tunnel on the Lackawanna Cut-Off in Byram Township, Sussex County, New Jersey. The tunnel is on a straight section of railroad between mileposts 51.6 and 51.8 (83 km), about 6 miles (9.7 km) north by northwest of Port Morris Junction. Operated for freight and passenger service from 1911 to 1979, it is undergoing work intended to return it to passenger service by 2026.

Wikidata
railway tunnelUnited States
link={{{3}}}
    ​ ​ ​ ​ ​ ​ ​ ​ ​


Location: 40.971, -74.7105, KML, Cluster Map, Maps,
8 places

Loading map...
  • Allamuchy Pond Dam
  • Apshawa Main Dam
  • Auxiliary Reservoir Dam
  • Balesville Dam
  • Pahaquarry Copper Mine
    historic copper mine in Warren County, New Jersey
  • Backwards Tunnel
  • Oxford Tunnel
    It was one of seven tunnels built to complete Warren Railroad.
  • Roseville Tunnel
    rail tunnel in New Jersey
    TypeSubtypeDateDescriptionNotesSource
    sitecaveAllamuchy Pond DamcaveWikidata
    sitecaveApshawa Main DamcaveWikidata
    sitecaveAuxiliary Reservoir DamcaveWikidata
    sitecaveBalesville DamcaveWikidata
    siteminePahaquarry Copper Minecopper mineWikidata
    sitetunnelBackwards TunneltunnelWikidata
    sitetunnelOxford Tunnelrailway tunnelWikidata
    sitetunnelRoseville Tunnelrailway tunnelWikidata